Section J
Pay the deposit
A 50% deposit is payable when you accept the quote. The balance is due before the report is released. Work starts when the deposit is paid and the drawing set is complete enough to assess.
The report is prepared
Standard turnaround is 48 to 72 hours from full drawings. Items that cannot be checked are listed, not assumed to pass.
Revision and release
One minor revision is included. A minor revision is a correction, or a small drawing change that does not add scope. A new tenancy, a different classification, or a redesigned façade is quoted again.