Section J reports, prepared from the drawings

From $650 inc GST. A Deemed-to-Satisfy check of the work on the drawings, written so a certifier can use the first page. Turnaround 48 to 72 hours from full drawings.

When you need one

Building approvals for new commercial buildings, fit-outs, refurbishments, extensions and changes of use commonly ask for evidence that Section J is met. This practice prepares that evidence on the Deemed-to-Satisfy pathway for Class 5, 6, 7b and 9b buildings. If the design does not meet those provisions, the report says so. It does not paper over a fail with a performance solution.

Who it is for

Building classes

  • Class 5

    Office

    Office buildings used for professional or commercial purposes.

  • Class 6

    Shop

    Shops, cafes, restaurants and other retail premises.

  • Class 7b

    Warehouse

    Buildings for storage. Car parks (Class 7a) are outside the usual scope.

  • Class 9b

    Public building

    Assembly buildings such as halls, schools and similar public buildings. Health-care buildings (Class 9a) and aged-care buildings (Class 9c) are not the focus of this practice.

What you receive

  • A Deemed-to-Satisfy assessment of the work shown on the drawings
  • Fabric, glazing, building sealing, artificial lighting and the services items that fall inside the scope
  • A compliance summary on the first page for the building certifier or surveyor
  • The edition of the NCC, and any state variation that changes an item in scope
  • A list of assumptions, and of information that was not on the drawings
  • One minor revision after you review the draft

What to send

  • Architectural drawings for the scope: plans, elevations and sections
  • Wall, roof and floor build-ups where fabric is being assessed
  • Glazing sizes, glass and frames where glazing is new or altered
  • Lighting layout and a luminaire or lamp schedule
  • Mechanical drawings or equipment schedules where air-conditioning or ventilation is in scope
  • The site address, and the NCC edition if the certifier has already nominated one

What this is not

  • Not a JV3 or other performance model.
  • Not a NatHERS certificate or a BASIX certificate. Those are separate residential services.
  • Not a site inspection. If it is not on the drawings, it is not assessed.
  • Not a building approval. The certifier decides whether the report satisfies their checklist.

Next step

Get a fixed quote before any work starts.

Upload the drawings, or call the number beside the button. The fee comes back in writing. Sending a request does not appoint the practice.