Skip to content
Carbon EdgeConsulting

NCC Volume One · Section J · Deemed-to-Satisfy

Fixed-fee Section J reports for commercial fit-outs.

Carbon Edge Consulting prepares design-document Section J reports for commercial fit-outs, refurbishments and new buildings, and coordinates NatHERS nationally and BASIX in New South Wales, and prepares waste management plans for every state and territory. Andrew Costi is your project contact, and he prepares the waste management plans himself. Section J fees start at $650 inc GST.

From
$650 inc GST to start
Turnaround
48 to 72 hours
Coverage
All of Australia

Section J report

$650 inc GSTto start·per project

Standard turnaround 48 to 72 hours for a straightforward file.

A fixed quote is given after the drawings are reviewed. The starting fee is for a straightforward project. A larger floor plate, more than one classification, or an incomplete set is priced before you commit.

A 50% deposit is payable on acceptance. Work starts after acceptance, the deposit and complete assessment information. The Section J balance is due before the report is released. A Section J engagement includes one minor revision: a correction or a small drawing change that adds no scope. A new tenancy, a different classification or a redesigned facade is quoted again. Corrections to our own errors are not counted as a client revision.

Get a fixed quote

Coordinated residential assessments

NatHERS is coordinated nationally and BASIX only for applicable New South Wales projects. Fees below are our assessment fee, ex GST. Certificate and provider charges are separate and confirmed at cost. Published residential standard is 2 to 3 business days.

NatHERS fees

Written for the people who have to use it

Building certifiers and surveyors

A compliance summary on the first page: edition, scope, what was checked, and what is still open.

Builders

The report lists the construction it relied on, so the set that was assessed is the set you can build from.

Architects and interior designers

Use a full report for lodgement, or ask for design-stage advice before the façade, lighting and interior fit-out are frozen.

Fit-out companies

Tenancy work for fit-out companies is quoted on the fit-out drawings, not as a whole-building reassessment by default.

Classes 5, 6, 7b and 9b

Usual Section J scope is Class 5, 6, 7b and 9b fit-outs, refurbishments and new buildings. Other classifications, mixed-use developments and apartment common areas need a separate scope and capability confirmation before acceptance. This is not a blanket whole-building or Class 2 to 9 service.

  • Class 5

    Office

    Office buildings used for professional or commercial purposes.

  • Class 6

    Shop

    Shops, cafes, restaurants and other retail premises.

  • Class 7b

    Warehouse

    Buildings for storage. Car parks (Class 7a) are outside the usual scope.

  • Class 9b

    Public building

    Assembly buildings such as halls, schools and similar public buildings. Health-care buildings (Class 9a) and aged-care buildings (Class 9c) are not the focus of this practice.

How a report is commissioned

The full sequence
  1. 01

    Send the drawings

    Plans, schedules and a link or a file. Say which state and which NCC edition if you know it.

  2. 02

    Fixed quote

    The fee is confirmed from the drawings before any assessment starts.

  3. 03

    Deposit

    A 50% deposit is payable on acceptance. Work starts after acceptance, the deposit and complete assessment information. The Section J balance is due before the report is released.

  4. 04

    Report

    The published standard for a straightforward Section J file is 48 to 72 hours. The project quote confirms delivery time after acceptance, the deposit and complete information. That target is not defined here as business hours or elapsed hours. Third-party certificates and approval decisions are outside it.

  5. 05

    Revision

    A Section J engagement includes one minor revision: a correction or a small drawing change that adds no scope. A new tenancy, a different classification or a redesigned facade is quoted again. Corrections to our own errors are not counted as a client revision.

Waste Management Plans

Andrew Costi prepares waste management plans for demolition and construction, and for the ongoing use of residential, mixed-use and commercial buildings. The service covers every Australian state and territory. The fee is set in the quote. Nothing on this site prices the plan.

Assessed from drawings, anywhere in Australia

There is no site visit. The climate zone and any state variation are taken from the project, not from a generic national template.

For certifiers

The report names the edition confirmed for that application. Ask for a sample if you want to see the structure before you refer a project. A sample is not evidence for an approval, and the assessment does not replace certificates the certifier requires from other practitioners.

What the report contains

Common questions

What does Carbon Edge Consulting prepare?

Carbon Edge Consulting prepares design-document Deemed-to-Satisfy Section J reports for commercial fit-outs, refurbishments and new buildings in the usual classes, coordinates residential NatHERS and BASIX through an appointed project assessor, and prepares waste management plans. Andrew Costi prepares the waste management plans himself and is the project contact for the other services. The fee, pathway and issuer are confirmed in the quote before work starts. An engagement already accepted is not narrowed by later wording on this site. The accepted project quote defines the scope, deliverables, exclusions, fees and timing for that project.

What is a Section J report?

Section J is the energy efficiency part of NCC Volume One. A Section J report from this practice is a Deemed-to-Satisfy assessment of the work and Parts named in the quote. It records what meets the listed provisions, what does not, what is outstanding, and what was not assessed. It is not an energy model and it is not a Performance Solution. J6, J7 and J8 keep that numbering in NCC 2022 and NCC 2025.

Which NCC version applies?

Reports are prepared to the NCC edition that applies to the application. If your referral names an edition, that is the one used. As at November 2026, Victoria has applied NCC 2025 since 1 May 2026, with no general transition period. The ACT allows either edition until NCC 2025 becomes mandatory on 1 May 2027. A development application or works approval lodged in the ACT before 1 November 2026 may keep that choice until the application expires. Western Australia adopted NCC 2025 on 1 May 2026. Building permit applications there may still use NCC 2022 until 30 April 2027. New South Wales and Queensland move to NCC 2025 on 1 May 2027, and NCC 2022 remains in force until then. South Australia moves the Building Code of Australia, including Section J, on 1 May 2027. Its Plumbing Code of Australia was adopted on 1 May 2026. Tasmania moves to NCC 2025 on 1 May 2027. NCC 2025 applied in Tasmania from 1 May to 4 June 2026, and NCC 2022 applies again from 5 June 2026. The Northern Territory has not set a date and remains on NCC 2022.

All questions