Skip to content
Carbon EdgeConsulting

Waste management · Australia-wide

Waste Management Plans for the application in front of you

Andrew Costi prepares the plan himself, for projects in every Australian state and territory. It sets out how waste is to be handled during demolition and construction and, where the council asks, once a residential, mixed-use or commercial building is in use.

What a waste management plan is

A waste management plan is the document that says what waste a project is expected to generate, and how that waste will be stored, separated, reused, recycled or removed. Councils commonly ask for one with a development application. Some ask only about the building site. Others also ask how the finished building will deal with waste from its occupants.

The plan is written from the architectural plans, the site, and the council you name. It does not redesign the building, and it is not a development consent or a statement that a particular council will accept it.

When a council asks

A demolition and construction plan is the usual request where works will pull a building down or create construction waste, and the development application has to show how that waste will be managed. An ongoing plan is the usual request where the council wants to see how a residential, mixed-use or commercial building will store and collect waste after occupation. Send the council’s checklist if you have it. The quote follows that request rather than a standing list of councils.

The plans we prepare

Demolition and construction

A plan for a development application that has to show how waste will be handled while a site is being cleared and built. It deals with the demolition and construction stage, not with how the finished building will run, unless that is also in the quote.

Ongoing or operational

A plan for the waste a completed residential, mixed-use or commercial building is expected to produce. It uses the storage and collection arrangements shown on the drawings, and the council’s request for that stage.

What we need from you

  • Architectural plans, including any demolition plan and the waste storage area if one is drawn
  • The site address, a short description of what is being demolished, built or occupied, and the council
  • Any waste guideline, checklist or condition the council has already given you

What the plan covers

  • The waste streams that can be identified from the drawings and the description you send
  • How demolition and construction waste is proposed to be separated, stored on site, reused, recycled or taken away, when that stage is in the quote
  • For an operational plan, the storage area shown on the plans and whether collection is described as council or a private contractor
  • Anything that cannot be completed because the drawing or the council’s requirement was not provided. Those items are listed, not filled in

How it proceeds

  1. 01

    Send the plans

    Use the quote form. Attach the architectural plans or a link, name the site, and name the council.

  2. 02

    Written quote

    The fee is set after the plans and the council’s requirements are reviewed. Sending the form does not appoint us.

  3. 03

    Accept and pay the deposit

    Work starts when you accept the written quote and pay the deposit it describes.

  4. 04

    The plan is prepared

    Andrew Costi prepares the plan himself, from the drawings and the information in the quote.

  5. 05

    You receive the plan

    The plan is for the project named in the quote. It is material for the application. It is not a development consent.

Questions

Who prepares the plan?

Andrew Costi prepares waste management plans himself. He is the person who writes the plan, not a coordinator passing it to someone else.

Which states are covered?

The service covers New South Wales, Victoria, Queensland, South Australia, Western Australia, Tasmania, Australian Capital Territory and Northern Territory. There is no local office and no travel charge. The same remote process is used wherever the site is.

When do councils ask for one?

Many councils ask for a waste management plan with a development application, so they can see how waste will be stored and removed during the works and, for some buildings, once they are occupied. The requirement comes from that council and that application. If you are not sure, send the council’s name and any checklist you have. We do not decide the council’s requirement, and we do not claim the plan will be approved.

Can one plan cover construction and later operation?

Yes, when the council has asked for both and the drawings show both stages. If the operational storage is not on the drawings, that part is not written as if it were. The quote says which stage is included.

Is a fee published on this page?

No. There is no starting price for a waste management plan on this site. The quote states the fee after the plans and the council’s request have been reviewed.

Is the plan a building approval?

No. It is a plan for the application named in the quote. The council or certifier decides what the application needs and whether to accept it.

Ask for a quote

The quote form is the same form used for the rest of the practice. Choose Waste Management Plan, name the state, and send the plans. No price is published here.