The report is written so the result is on the first page. Tell us which reports or certificates your checklist requires. We confirm whether each item is Deemed-to-Satisfy evidence, a Performance Solution, or a certificate from another practitioner before quoting. Acceptance of the evidence remains with you.
What the summary states
- The NCC edition and amendment the assessment used, and the state or territory
- The building class and the parts of the work that were in scope
- Whether each assessed item meets the listed Deemed-to-Satisfy provisions, does not, is outstanding, was not assessed, or is not applicable for a stated reason
- State variations that changed an item in scope
- Assumptions, and drawings or schedules that were missing
- A statement that the report is not a Performance Solution, not an engineering certificate, and not itself a building approval
Edition for this application
Reports are prepared to the NCC edition that applies to the application. If your referral names an edition, that is the one used. As at November 2026, Victoria has applied NCC 2025 since 1 May 2026, with no general transition period. The ACT allows either edition until NCC 2025 becomes mandatory on 1 May 2027. A development application or works approval lodged in the ACT before 1 November 2026 may keep that choice until the application expires. Western Australia adopted NCC 2025 on 1 May 2026. Building permit applications there may still use NCC 2022 until 30 April 2027. New South Wales and Queensland move to NCC 2025 on 1 May 2027, and NCC 2022 remains in force until then. South Australia moves the Building Code of Australia, including Section J, on 1 May 2027. Its Plumbing Code of Australia was adopted on 1 May 2026. Tasmania moves to NCC 2025 on 1 May 2027. NCC 2025 applied in Tasmania from 1 May to 4 June 2026, and NCC 2022 applies again from 5 June 2026. The Northern Territory has not set a date and remains on NCC 2022.
J1V3 energy simulation (often called JV3) and other Performance Solutions are not included in a Deemed-to-Satisfy report or a services assessment, and they are not a standard offered service. If a Performance Solution is required, its provider, capability, method, deliverables and fee are confirmed separately before any engagement is offered. A Deemed-to-Satisfy assessment does not by itself satisfy every item on a certifier’s checklist.
Engineer and consultant certificates and declarations are not included. The client arranges and pays the responsible consultants. Installers supply completion evidence. Carbon Edge compiles evidence only where that task is in the quote, and compilation does not certify another party’s design or installation. Provider availability, fees and issue dates are not guaranteed.
Ask for a sample
A sample can be sent on request so you can see the structure of the report. It is illustrative, not evidence for an approval, and this site does not show client names or project photographs. Use the quote form and choose “Sample report for a certifier”. Andrew Costi will reply by email.