Perth referrals are typically office fit-outs, retail, warehouses and public buildings. A large warehouse is not given a fit-out price in disguise. The starting fee is the floor, and the fixed quote reflects the drawing set.
Western Australia has been on NCC 2025 since 1 May 2026. NCC 2022 is still accepted until about 30 April 2027. The compliance summary states the edition that applies to the application.
A coastal Perth project and an inland Western Australian site are not interchangeable. Glazing schedules and lighting power matter just as much here as on the east coast. Without them, the relevant lines stay open.
Turnaround is 48 to 72 hours from full drawings after the quote is accepted and the set is complete. A fixed quote is given after the drawings are reviewed. The starting fee is for a straightforward project. A larger floor plate, more than one classification, or an incomplete set is priced before you commit. One minor revision is included. A minor revision is a correction, or a small drawing change that does not add scope. A new tenancy, a different classification, or a redesigned façade is quoted again.
Classes
- Class 5 · Office. Office buildings used for professional or commercial purposes.
- Class 6 · Shop. Shops, cafes, restaurants and other retail premises.
- Class 7b · Warehouse. Buildings for storage. Car parks (Class 7a) are outside the usual scope.
- Class 9b · Public building. Assembly buildings such as halls, schools and similar public buildings. Health-care buildings (Class 9a) and aged-care buildings (Class 9c) are not the focus of this practice.
All services in Perth · Section J in Perth · For fit-out companies and designers