South Australian commercial work is handled remotely. Shop refurbishments, office fit-outs, warehouses and public buildings are quoted from the drawings, not from a trip to Adelaide.
The usual scope is a Class 5, 6, 7b or 9b fit-out or refurbishment, or a new building in one of those classes. A small shop alteration is not written up as if the whole base building were being reassessed, unless the drawings and the certifier’s brief actually cover that.
South Australian commercial work is handled remotely: shop refurbishments, office fit-outs, warehouses and public buildings, quoted from the drawings rather than from a trip to Adelaide.
A small shop alteration is not written up as if the whole base building were being reassessed, unless the drawings and the certifier’s brief actually cover that.
South Australia moves to NCC 2025 on 1 May 2027. If you already know whether the project is under NCC 2022 or NCC 2025, say so with the drawings. If you do not, it is confirmed before the report is issued.
The climate zone is the one for the site address. It is not borrowed from a previous Adelaide job. Glazing and lighting still need schedules before those lines can be closed.
Reports are From $650 inc GST. The fixed quote follows a review of the drawings. One minor revision is included. A 50% deposit starts the work, and the balance is due before the report is released.